The side Y-profile for side mounting installation, made of extruded aluminium, is ideally suited for a flush finish at the concrete edge. If required, the profile can be installed offset upwards so that the floor structure is flush with the upper edge of the profile.
A floor connection profile is available for a smooth transition to the floor structure. A fixing spacing of just 200 mm is required to securely fasten the floor Y-profile.
The VetroMount® all-glass railing system impresses with its high-quality appearance and simple installation, thanks to technically sophisticated components for glass storage and alignment. With just a few simple steps, even long railing sections can be installed in a time- and cost-saving manner. All accessories, such as end caps, cover profiles, and spacers etc., are available to match.
For indoor use, we recommend the following screws: Hilti concrete screw HUS3-H 10 x 100 (BO 5211160) or Fischer concrete screw ULTRACUT FBS II 10 x 85. For outdoor use, we recommend the following screws: Hilti concrete screw HUS-HR 10 x 105 (BO 5211161) or Fischer concrete screw ULTRACUT FBS II A4 US 10 x 85.
Important for implementation: When using outdoors, particular attention at the planning stage must be paid to drainage and wind loads. You can find the general building authority test certificate (AbP), important information on statics and drainage in the "Downloads" section.
About the product series VetroMount:
Glass railing systems enable maximum transparency in both interior and exterior construction. At the same time, installation should be both safe and intuitive and as time-saving as possible. Thanks to a patented safety mechanism and only a few fastening points for floor mounting, the VetroMount® tested railing system from Bohle meets exactly these expectations: It is safe to mount and at the same time extremely easy and cost-efficient to install.
Application note:
Test report or country-specific certificate and further information in the downloads.